土压平衡顶管下穿市政主干道施工技术

Pipe Jacking Construction Technology Underpass Municipal Main Road Based on Soil Pressure Balance
下载PDF
导出
摘要 结合工程实例,分析了土压平衡顶管施工时的管道埋深对道路路基的影响及顶管下穿道路时的沉降量,并就土压平衡顶管施工下穿市政主干道的施工技术要点展开了详细的研究,以保证城市主干道周围建筑及设施安全,减少顶管施工对主干道交通的干扰,提高顶管施工效率。 Combined with engineering examples,the influence of pipe buried depth on road subgrade and the settlement when pipe jacking passes through road under soil pressure balance construction are deeply analyzed,and the key points of construction technology ofthe municipal main road under soil pressure balance pipe jacking construction are studied in detail,so as to ensure the safety of buildings and facilities around the main road,reduce the interferenceofpipejacking construction on the main road traffic,and improve the efficiency of pipejacking construction.
作者 刘志发 LIU Zhi-fa(CCCC Fourth Harbor Engineering Co.Ltd.,Guangzhou 510000,China)
出处 《工程建设与设计》 2024年第2期143-145,共3页 Construction & Design for Engineering
关键词 市政道路 土压平衡顶管 施工技术 municipal road soil pressure balance pipe jacking construction technology
  • 相关文献

参考文献3

二级参考文献12

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部