摘要
山地工业园建设场地地形起伏大、地质情况复杂,在此自然地形背景下园区场地常采用台阶式布置方案,并利用厂区道路连接各级台地,由此形成了厂区高人工边坡和自然边坡等系列设计难题,有必要对此类设计方案进行技术经验总结。鉴于此,结合福建省宁德市周宁县站前工贸园工程,总结了该地形地貌下场地总平、建筑布置、厂区道路、排水措施、高边坡支护工程等一系列关键问题设计方案,以期为同类工程提供一些设计思路。
The construction site of mountainous industrial park has large topographic relief and complex geological conditions.Under this natural terrain background,the stepped layout scheme is commonly used for the park site.The factory roads are used to connect every stepped place,which causes a series of design problems in the factory manned slope and natural slope.It is necessary to summarize the technical experience of the design scheme.In view of this,taking the Fujiang Province Zhouning County Station Industry and Trade Park Project as an example,a series of key problems of site general plan,building layout,factory area road,drainage measures,high slope support engineering,etc.in this landform of design scheme are summarized in order to provide some design ideas for similar projects.
作者
段文康
唐文元
谢东
姚鹏飞
杨韩
DUAN Wenkang;TANG Wenyuan;XIE Dong;YAO Pengfei;YANG Han
出处
《城市道桥与防洪》
2024年第2期260-265,I0022,I0023,共8页
Urban Roads Bridges & Flood Control
关键词
山地复杂地形
工业园区
场地设计
市政设计
complex mountainous terrain
industrial park
site design
municipal design