摘要
后压浆灌注桩质量控制是土木工程中的重要环节,关系到工程的质量和安全。论文综合分析了后压浆灌注桩的施工内容以及施工工序,并在此基础上结合工程施工的实际情况提出了对应的优化策略,从施工全过程的技术要点控制、精确实施桩位测量验收、加强桩径控制与设计管理等多方面提出了对应的优化方法与管理手段,旨在为实际工程中后压浆灌注桩的施工质量控制提供建设性意见。
Quality control of post grouting pile is an important link in civil engineering,which is related to the quality and safety of the project.This paper comprehensively analyzes the construction content and process of post grouting pile,and proposes corresponding optimization strategies based on the actual situation of engineering construction,corresponding optimization methods and management measures are proposed from various aspects such as controlling the technical key points of the entire construction process,accurately implementing pile position measurement and acceptance,strengthening pile diameter control and design management,intended to provide constructive suggestions for the construction quality control of post grouting piles in practical engineering.
作者
范鑫锋
李金宝
师旭
王宇琛
樊立新
Xinfeng Fan;Jinbao Li;Xu Shi;Yuchen Wang;Lixin Fan(China Construction International Construction Co.,Ltd.,Beijing,100000,China;China Construction Fifth Bureau Third Construction Co.,Ltd.Northern Company,Qingdao,Shandong,266000,China)
出处
《工程设计与施工》
2023年第11期30-32,共3页
Engineering Design and Construction
关键词
后压浆灌注桩
施工管理
质量控制
桩体
桩径
post grouting pile
construction management
quality control
pile body
pile diameter