摘要
绍兴国际会展中心一期B区工程包含1个单层72 m跨展厅、1个双层展厅、1个会议中心和会展廊等,主要介绍其72 m跨展厅钢结构安装工程,系统介绍了其施工的重难点和解决措施,同时也全面地阐述了各个部位结构的施工方案,详细地说明了大跨展厅施工的关键技术,可为今后类似工程提供参考。
Area B project of Shaoxing International Convention and Exhibition Center Phase I includes a single-layer 72m span exhibition hall,a double-layer exhibition hall,a conference center and Exhibition Gallery.This paper mainly introduces the steel structure installation project of 72 m span exhibition hall,systematically introduces the key and difficult points and solutions of its construction,and comprehensively expounds the construction scheme of each single structure.In particular,the key technologies of long-span exhibition hall construction are described in detail,which can provide reference for similar projects in the future.
作者
杨林
贾尚瑞
王强
王超杰
YANG Lin;JIA Shang-rui;WANG Qiang;WANG Chao-jie(Zhejiang Jjinggong Steel Building Group Co.,Ltd,312030.Shaoxing.Zhejiang,China)
出处
《建筑技术》
2024年第3期313-317,共5页
Architecture Technology
关键词
钢结构
钢结构预起拱
钢结构卸载
会展中心
steel structure
steel structure pre camber
steel structureuninstall
exhibition center