浅谈水电站工程剩余物资由基建交付电力生产后存在的问题及解决措施

A Brief Discussion on the Problems and Solutions after the Surplus Materials of the Hydropower Station Project Are Delivered from the Infrastructure to Power Production
下载PDF
导出
摘要 水电站工程剩余物资多由基建单位因各种原因产生,工程建设中有一定数量的剩余物资现象普遍存在。笔者对工程剩余物资在由基建交付电力生产后存在的问题展开了思考,同时结合财务和审计角度提出了相应的解决措施;为已接收工程剩余物资的电力生产单位在处理工程剩余物资的方面提供了一定的借鉴意义。 The surplus materials of hydropower station projects are mostly produced by the capital construction unit for various reasons,and it's common that there are a certain number of surplus materials in the construction of the project.The problems of the surplus materials of the project after being delivered from the capital construction to the power production are considered,and the corresponding solutions are put forward from the perspective of finance and audit in this paper.It provides a certain reference for the power production units that have received the project surplus materials when dealing with the project surplus materials.
作者 赵宇阳 ZHAO Yuyang(CCHN ENERGY Dadu River Dagangshan Power Generation Co.,Ltd,Shimian Sichuan 625409)
出处 《四川水力发电》 2024年第1期143-146,共4页 Sichuan Hydropower
关键词 ERP系统 电力生产 工程剩余物资 ERP system Power production Project surplus materials
  • 相关文献

参考文献5

二级参考文献7

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部