摘要
施工支洞作为抽水蓄能电站的组成部分,对施工进度、土石方平衡、施工交通运输、投资估算等都有着重要影响。本文以黑龙江省某抽水蓄能电站为例,主要论述了抽水蓄能电站施工支洞设计,可供类似工程设计参考。
As a component of pumped storage power station,construction branch tunnel has important influence on construction schedule,balance of soil and rock,construction transportation,investment estimation and so on.Taking a pumped storage power station in Heilongjiang Province as an example,this paper mainly discusses the construction branch tunnel design of pumped storage power station,which can be used as reference for similar engineering design.
作者
李叶
李志国
LI Ye;LI Zhi-guo
出处
《东北水利水电》
2024年第3期1-3,20,71,共5页
Water Resources & Hydropower of Northeast China
关键词
抽水蓄能电站
施工支洞
pumped storage power station
construction branch tunnel