摘要 榆树田煤矿110403工作面运输巷采用超高水填充材料进行巷旁充填沿空留巷支护,根据生产条件和巷道支护状况,确定了巷旁充填体的布设及尺寸,提出充填体和留巷巷道加强支护的方法措施,选择了支护参数。通过数值模拟,预计了围岩变形量,可为该运输巷进行巷旁充填沿空留巷提供技术支持。 This article introduced the technology of using ultra-high water filling material to fill the roadway side and gob-side entry retaining support in the No.110403 working face of Yushutian Coal Mine.Based on production conditions and roadway support conditions,the layout and size of the roadway side filling body were determined,and methods and measures for strengthening support of the filling body and retaining roadway were proposed.Support parameters were selected,and the deformation of the surrounding rock was predicted through numerical simulation,which has provided technical support for roadside packing and gob-side entry retaining for the transportation roadway.
作者 杨建坤 YANG Jian-kun(Xinjiang Kuqa County Xiakuotan Mining Company,Kuqa 842200,China)
出处 《煤炭科技》 2024年第1期38-42,共5页 Coal Science & Technology Magazine
关键词 沿空留巷 高水材料 充填体 巷旁充填 加强支护 gob-side entry retaining high water content material filling body roadside packing strengthening support
  • 相关文献

参考文献12

二级参考文献149

共引文献1087

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部