期刊文献+

综采工作面安装拆除现状及改进方法研究

Research on the Current Situation and Improvement Methods of Installation and Demolition in Fully Mechanized Mining Faces
下载PDF
导出
摘要 为提高综采工作面安装与拆除出成效,本文探讨工作现状,如安装和拆除环境复杂、安装和拆卸空间、工具比较落后等,提出具体的改进方法,不但可以提高了作业面的总体水平,而且能够减少各类隐患,提升安全作业成效,以期为相关人员提供参考。 In order to improve the efficiency of installation and dismantling of fully mechanized mining faces,this article explores the current situation of work,such as complex installation and dismantling environments,outdated installation and dismantling spaces,and tools.Specific improvement methods are proposed,which not only improve the overall level of the working face,but also reduce various hidden dangers and improve safety operation efficiency,in order to provide reference for relevant personnel.
作者 李大为 Li Dawei(Fenxi Mining Industry Group Gaoyang Coal Mine,Xiaoyi Shanxi 032300,China)
出处 《山西化工》 CAS 2024年第2期190-191,215,共3页 Shanxi Chemical Industry
关键词 综采工作面 安装 拆除 fully mechanized mining face installation dismantle
  • 相关文献

参考文献5

二级参考文献23

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部