摘要
大跨度预应力混凝土斜拉桥施工的关键技术是一个复杂而重要的工程领域,涉及多方面的工程技术和管理策略。本文旨在探讨大跨度预应力混凝土斜拉桥施工中的关键技术,分析其在设计和施工阶段的挑战和解决方案。通过对国内外相关工程案例的深入分析,本文将系统总结这类桥梁施工的最佳实践和创新技术,以期为未来大跨度预应力混凝土斜拉桥的设计与施工提供有价值的参考和指导。
The key technology of large-span prestressed concrete deck cable stayed bridge construction is a complex and important engineering field,and involves a variety of engineering technologies and management strategies.The purpose of this paper is to explore the key technologies in the construction of large-span prestressed concrete deck cable stayed bridge,and to analyze the challenges and solutions in the design and construction stages.Through the in-depth analysis of relevant engineering cases at home and abroad,this paper will systematically summarize the best practices and innovative technologies of this type of bridge construction,aiming to provide valuable reference and guidance for the design and construction of large-span prestressed concrete deck cable stayed bridge in the future.
作者
金波
Jin Bo(CCCC Second Highway Engineering Bureau Dongmeng Engineering Co.,Ltd.,Xi’an 710075,Shaanxi Province,China)
出处
《科学与信息化》
2024年第5期100-102,共3页
Technology and Information
关键词
大跨度
预应力
混凝土
斜拉桥
施工
large-span
prestress
concrete
deck cable stayed bridge
construction