摘要 插板桩护岸桩顶位移远超规范规定限值,整体倾向河中心,观感不佳,且插板桩有失稳风险。通过探讨插板桩护岸桩顶位移过大的具体原因,总结了相关经验教训,为同一类型其他河道整治护岸工程提供参考与借鉴。 The top displacement of the insert plate pile revetment pile is far beyond the limit value specified in the code,and the overall tendency is toward the river center,with poor impressions and unstable risk of insert plate pile.This paper discusses the specific causes for the excessive displacement of pile top displacement,summarizes the relevant experiences and lessons,and provides reference for other river regulation and revetment projects of the same type.
作者 徐静 周庆连 李强 苏凯 苏叶平 XU Jing;ZHOU Qinglian;LI Qiang;SU Kai;SU Yeping(Yangzhou Survey Design Research Institute Co.,Ltd.,Yangzhou 225007,China;Lianyungang Water Conservancy Planning and Design Institute Co.,Ltd.,Lianyungang 222006,China;Nanjing River Construction Co.,Ltd.,Nanjing 211500,China;Jiangsu Province Engineering Investigation and Research Institute Co.,Ltd.,Yangzhou 225007,China;Jiangsu Surveying and Design Institute of Water Resources Co.,Ltd.,Yangzhou 225127,China)
出处 《江苏水利》 2024年第3期41-44,共4页 Jiangsu Water Resources
关键词 插板桩 桩顶位移 护岸 insert plate pile pile top displacement revetment
  • 相关文献

参考文献1

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部