摘要 地铁已形成网络化运营模式,换乘节点越来越多。因为规划等原因,建设较早的地铁线路没有预留后期换乘接入条件。因此,在新线建设过程中,往往伴随着新建站带来的既有车站换乘改造和升级。其中,通信传输系统的改移和升级建设是重点工作之一。通信系统是城市轨道的交通神经,包括公安通信系统,民用通信系统和专用通信系统等,支持控制中心与车站、车辆的信息往来,并为乘客提供稳定的通信服务。针对在既有线运行条件下,换乘站改造带来的通信设备改移以及通信扩容需求等问题进行方案探讨,提出公安传输系统增强型MSTP建设方案和骨干传输系统OTN建设方案。以北京地铁10号线西土城站为例进行方案设计,10号线西土城站与新建地铁昌平线南延(简称昌南线)相交,换乘站建筑结构及功能的改变,对通信系统的设备升级、机房部署等都提出了新的要求,本文将设计方案应用于该换乘项目,验证了所提方案的合理性,研究成果以期为其他既有站换乘改造的通信系统升级提供参考。 As subway construction in China continues,the network operation mode of subway emerges,and more transfer nodes are created.Due to planning and other factors,the earlier-built subway lines did not reserve future transfer access conditions.Thus,when new lines are built,the existing stations often undergo transfer transformation and upgrading along with the new stations.Among the key tasks involved,the communication transmission system transformation and upgrading is crucial.The communication system is the traffic nerve of urban rail,which consists of public security communication system,civil communication system,and special communication system.It supports the information exchange between the control center and the stations and vehicles,and provides stable communication service for passengers.This paper examines the communication room transformation and communication capacity expansion requirements resulting from the transfer station transformation under the existing line operation conditions,and proposes the enhanced MSTP construction scheme for public security transmission system and the backbone transmission system OTN construction scheme.Xitucheng Station of Beijing Metro Line 10 intersects with the newly built metro Changnan Line,and the transfer station changes in building structure and function have raised new requirements for the communication system equipment deployment and upgrade.This paper applies the design scheme to the transfer project,verifies the rationality of the proposed scheme,and the research results offer an application reference scheme for the communication system upgrade of the existing station transfer transformation.
作者 梁海英 王玉杰 LIANG Haiying;WANG Yujie(Beijing MTR Construction Administration Corporation,Beijing 100068;Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit,Beijing 100068;Beijing No.4 Municipal Construction Engineering Co.,Ltd.,Beijing 100037)
出处 《都市快轨交通》 北大核心 2024年第1期44-48,共5页 Urban Rapid Rail Transit
基金 北京市轨道交通建设管理有限公司双创基金(SCJJ2021005)。
关键词 既有站改造 换乘节点 通信系统 transformation of the existing station transfer node communication systems
  • 相关文献

参考文献12

二级参考文献52

  • 1崔林钊,牛犇,陈勇,荣传新,施鑫.地铁换乘站坑中坑受力变形现场监测分析[J].建筑结构,2020,50(S02):726-731. 被引量:1
  • 2徐成永,贺鹏,邱丽丽.北京地铁13号线运能提升改造综合实施方案剖析[J].都市快轨交通,2021,34(2):54-58. 被引量:7
  • 3龚小聪.地铁通信传输系统方案探讨[J].都市快轨交通,2005,18(2):60-62. 被引量:18
  • 4虹信通信,多系统合路时的地铁覆盖分析,C114中国通信网2010年8月2日.
  • 5城市轨道交通通信.李伟章等,中国铁道出版社,2010年1月.
  • 6上海市城市交通管理局,城市轨道交通无线通信系统技术规范.2004年4月.
  • 7云海通讯.城市地铁覆盖综合解决方案,http://www.winhap.com/solution/index.asp.
  • 8铁道部通信信号总公司.铁路工程施工技术手册通信.北京:中国铁道出版社,2003.
  • 9铁科技[2007]61号《铁路200-250既有线技术管理暂行办法》.中华人民共和国铁道部.2007.
  • 10北京城建设计研究总院有限责任公司.杭州地铁一期工程市民中心站施工图[Z].北京,2008.

共引文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部