桥梁钢管拱安装施工技术研究 被引量:1

Research on Installation and Construction Technology of Bridge Steel Pipe Arch
下载PDF
导出
摘要 某钢管混凝土系杆拱桥主跨100m,采用先梁后拱法。结合施工现场情况,钢管拱采用吊装配合支架法安装施工。文章重点介绍了钢管拱节段划分、吊装设备选用、临时支架设计、安装步骤、线性控制等内容,可为类似条件下的系杆拱桥钢管拱安装施工提供参考。 A steel tube concrete tied arch bridge with a main span of 100m is constructed using the beam first and then arch method.Based on the construction site conditions,the steel pipe arch is installed using the lifting and supporting method.The article focuses on the division of steel pipe arch segments,selection of lifting equipment,design of temporary supports,installation steps,linear control,etc.,which can provide reference for the installation and construction of steel pipe arches in tied arch bridges under similar conditions.
作者 唐华 TANG Hua(China Railway Eighth Bureau Group First Engineering Co.,Ltd.,Chongqing 400053,China)
出处 《价值工程》 2024年第7期62-64,共3页 Value Engineering
关键词 钢管拱 吊装 支架 steel pipe arch lifting support
  • 相关文献

参考文献2

二级参考文献6

共引文献1

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部