摘要
装配式建筑凭借其生产效率高、环境污染少的特点得到了建筑工程行业的广泛推广。模壳剪力墙作为装配式建筑的一种新型表现形式,既优化了现浇结构支模的工序,又保留了装配式建筑工厂化生产的特点,同时避免了常见预制构件的套筒灌浆工序。通过工程实例对模壳剪力墙的实际应用,从多角度总结该种材料的管理要点,旨在建立模壳剪力墙的项目管理体系。
Prefabricated building has been widely promoted in the construction industry because of its high production efficiency and less environmental pollution.Formwork shear wall,as a new form of prefabricated building,not only optimizes the process of cast-in-place structure formwork,but also retains the characteristics of prefabricated building factory production,while avoiding the sleeve grouting process of common prefabricated components.Through the practical application of formwork shear wall,the management points of this kind of material are summarized from various angles,aiming at establishing the project management system of formwork shear wall.
作者
曹君
CAO Jun(Shanghai Construction No.1(Group)Co.,Ltd.,Shanghai 200120,China)
出处
《建筑施工》
2024年第3期438-440,共3页
Building Construction
基金
上海建工一建集团有限公司科研项目课题(YJ-101-2019-001)。
关键词
模壳剪力墙
住宅工程
工程管理
技术管理
成本分析
formwork shear wall
residential engineering
engineering management
technical management
cost analysis