2017年5月山东港口青岛港全自动化集装箱码头正式投产运营,并实现当年投产当年盈利。2021年底着手开展三期工程建设。高质量如期完成施工是自动化码头尽快投入生产的关键。因此本项目结合智慧工地的建设,在质量、工期、效益等方面走在前列,用科学、信息化的手段建设港口工程,在绿色港口科技创新方面做出努力和探索。
In May 2017,Qingdao Port Fully Automated Container Terminal of Shandong Port was put into operation officially,and achieved profitability in the year of operation.The construction of the third phase of the project began at the end of 2021.High quality and timely completion of construction is the key to the prompt production of automated terminal.Therefore,combined with the construction of smart site,this project aims to take the lead in terms of quality,construction period and benefits,use scientific and information-based means to build port projects,and make efforts and exploration in the scientific and technological innovation of green port.
作者
杨锦
YANG Jin(Shandong Harbor Construction Group Co.,Ltd.)
出处
《智能建筑与智慧城市》
2024年第3期91-93,共3页
Intelligent Building & Smart City
关键词
自动化码头
智慧工地建设
水运工程
质量控制
automated terminal
intelligent site construction
water transport project
quality control