水电站水淹厂房风险要素分析及处理方案

Analysis of Risk Factors and Treatment Plans for Flooded Hydroelectric Power Plants
下载PDF
导出
摘要 为降低水淹厂房事故率,保证水电站安全可靠运行,以新丰江水电站运行现状为例,分析水电站水淹厂房风险要素,设计水源监测点,构建基于无线通信的智能监测系统,在线监测实时水位情况;设计应急预案,做好事前预防、事中管控、事后处置,加强水电站水淹厂房风险防控。 In order to reduce the accident rate of flooded factory buildings and ensure the safe and reliable operation of the hydropower station,this study takes the operation status of Xinfengjiang Hydropower Station as an example,analyzes the risk factors of flooded factory buildings,designs water source monitoring points,constructs an intelligent monitoring system based on wireless communication,and monitors real-time water level online;Design emergency plans,carry out pre prevention,in-process control,and post disposal,strengthen risk prevention and control of hydropower plant flooding.
作者 黄赟轲 HUANG Yunke(Guangdong Yuedian Xinfengjiang Power Generation Co.,Ltd,Guangdong Heyuan 517000,China)
出处 《农村电气化》 2024年第3期86-88,共3页 Rural Electrification
关键词 水电站 水淹厂房 风险要素 应急处置 hydropower station flooded factory buildings risk factors emergency response
  • 相关文献

参考文献7

二级参考文献19

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部