期刊文献+

地铁运用库上盖结构设计难点分析与工程应用

Analysis and engineering application of the design difficulties of the upper cover structure of subway operation warehouse
下载PDF
导出
摘要 通过介绍地铁运用库上盖建筑开发的特点,分析了上盖结构体系普遍存在的底部刚度突变、竖向构件大量或全部转换等问题。以厦门第一个地铁上盖开发项目为例,阐述了地铁上盖结构设计的要点、难点,进行了大震下动力弹塑性分析,并对薄弱部位进行加强。根据项目施工存在分期情况,提出了相应的解决措施,可为同类型项目结构设计提供思路和参考。 By introduction of the characteristics of the building development of the upper cover building of the subway operation warehouse,the problems of sudden change of the bottom stiffness and large or total conversion of vertical members are analyzed.Taking the first subway roof development project in Xiamen as an example,this paper expounds the key points and difficulties of subway roof structure design,carries out dynamic elastic-plastic analysis under large earthquake,and strengthens the weak parts.According to the existing stages of project construction,the corresponding solutions are put forward.It can provide ideas and reference for the structural design of the same type projects.
作者 徐洪勇 XU Hongyong
出处 《福建建设科技》 2024年第2期30-33,共4页 Fujian Construction Science & Technology
关键词 上盖开发 全框支剪力墙 结构抗震性能目标 地铁运用库 “鸡腿式”结构 development of upper cover full frame-supported shear wall seismic performance objectives of structure subway operation warehouse "chicken leg"shaped structure
  • 相关文献

参考文献2

二级参考文献7

  • 1JGJ3-2010高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2011.
  • 2San Fernando, California, Earthquake of February 9, 1971 [R]. U.S. Department of Commerce,1973
  • 3MOSS Petre J. CARR Athol J, PARDEON Gerardc. Inelastic analysis of the imperial county services building[R]. Bulletin of the New Zealand National Society for Earthquake Engineering, 1983, 16(2).
  • 4.日本建筑学会阪神·淡路大震灾调查报告 [R].日本建筑学会,1997..
  • 5JGJ3-2002高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2002.
  • 6DBJ/T15-46--2005高层建筑混凝土结构技术规程(JGJ3-2002)补充规定[s].北京:中国建筑工业出版社,2005.
  • 7魏琏.高层建筑结构位移控制研讨[J].建筑结构,2000,30(6):27-30. 被引量:27

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部