摘要
以贵州地区薄煤层、高瓦斯采煤工作面回采为工程背景,为了提高采面煤炭资源采收率、缓解矿井采掘接替紧张局面以及降低巷道掘进成本,提出将切顶卸压技术应用到回采巷道留巷中。结合新鸿发煤矿1k302运输巷现场地质条件、布置情况等,介绍了薄煤层工作面切顶卸压留巷的施工工艺等,并通过监测顶板下沉情况,分析切顶卸压留巷效果。工程应用表明,在1k302运输巷采用的切顶卸压留巷技术方案效果显著,留巷段顶板最大下沉量控制在146.4 mm以内,留巷效果显著,为矿井煤炭安全高效回采创造了良好条件。
Taking the mining of thin coal seam and high gas coal face in Guizhou as the engineering background,in order to improve the recovery rate of coal resources at the mining face,relieve the tension of mining replacement and reduce the cost of roadway excavation,the technology of roof cutting and pressure is proposed to be applied to roadway retention.According to the geological condition and layout of 1k302 transportation lane in Xinhongfa Coal Mine,the construction technology of top cutting and unloading pres-sure relief retaining roadway on the working face of thin coal seam are introduced,and the effect top cutting and pressive relief is analyzed by monitoring the subsidence of roof.The engineering application shows that the roadway retention technology scheme adopted in 1k302 transport lane has remarkable effect,and the maximum subsidence of the roof in the roadway retention section is controlled within 146.4 mm,and the roadway retention effect is remarkable,which creates good conditions for safe and efficient coal mining in the mine.
作者
王海
WANG Hai(Energy Bureau of Zhenfeng County,Guizhou Province)
出处
《现代矿业》
CAS
2024年第2期113-115,120,共4页
Modern Mining
关键词
薄煤层
半煤岩巷道
切顶卸压
沿空留巷
thin coal seam
semi-coal rock roadway
top cutting pressure relief
gob-side entry retain-ing