500 kV变电站主变例行检修标准化作业流程

Standardized Work Flow of Routine Maintenance for 500 kV Substation Transformers
下载PDF
导出
摘要 以500 kV汾湖变1号主变例行检修为例,从主变检修周期、作业风险和停电前、停电期间、复电后各阶段详细介绍500 kV变电站主变例行检修标准化作业流程,以期为作业安全、质量、进度的管控水平的提升提供参考。 This paper takes the No.1 transformer of 500 kV Fenhu substation as an exemplary case and elaborates in detail standardized work flow of routine maintenance for 500 kV substation transformers from the perspectives such as MT maintenance cycle,operational risks,and the work stages of pre-outage,intra-outage and post-outage.It may provide useful information for the promotion of management and control of work safety,quality and progression with respect to routine maintenance of main transformers with 500 kV and other voltage levels.
作者 黄秀娟 潘成程 沙俊民 席钰佳 邓超 王周杰 HUANG Xiujuan;PAN Chengcheng;SHA Junmin;XI Yujia;DENG Chao;WANG Zhoujie(Super High Voltage Branch of State Grid Zhejiang Electric Power Co.,Ltd.,Hangzhou 310000,China)
出处 《电工技术》 2024年第3期121-123,共3页 Electric Engineering
关键词 500 kV变电站 主变 例行检修 标准作业流程 500 kV substation transformer routine maintenance standardized work flow
  • 相关文献

参考文献4

二级参考文献10

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部