地铁盾构区间碳排放模型构建及计算

Carbon Emission Model Construction and Calculation of Subway Shield Section
下载PDF
导出
摘要 地铁作为城市大型基础设施,其建造过程产生的碳排放量不可忽视,因此有必要对其施工建造过程进行碳足迹计算和分析。本文以采用盾构施工工艺的青岛某地铁区间为案例,基于全生命周期评价方法,构建物化阶段的碳排放模型。模型结果表明:整个地铁区间物化阶段碳排放占比最高的阶段是预制构件生产阶段,混凝土和钢筋的生产是产生二氧化碳的主要环节。在此结果上,使用再生建材代替预制构件生产阶段部分混凝土和钢筋,可有效降低整个过程的碳排放总量,并提出未来碳减排可能的方向。 As a large-scale urban infrastructure,the carbon emissions generated by the subway construction process cannot be ignored,so it is necessary to calculate and analyze the carbon footprint of the subway construction process.This paper takes a subway section in Qingdao with shield construction technology as an example,and constructs a carbon emission model in physicochemical stage based on the whole life cycle evaluation method.The results show that the highest proportion of carbon emission in the physical and chemical stage of the whole subway section is the production stage of precast components,and the production of concrete and steel bars is the main link to produce carbon dioxide.Based on the results,the use of recycled building materials to replace some concrete and steel bars in the production stage of prefabricated components can effectively reduce the total carbon emissions of the whole process,and suggest possible directions for carbon reduction in the future.
作者 刘泉维 王冬冬 毕延哲 姜晓明 李建强 罗楚桓 LIU Quan-wei;WANG Dong-dong;BI Yan-zhe;JIANG Xiao-ming;LI Jian-qiang;LUO Chu-huan(Qingdao Metro Line 6 Co.,Ltd,Qingdao 266427,China;Shanghai Civil Engineering Group Co.,Ltd of CREC,Shanghai 200436,China;China Railway Development Investment Co.,Ltd.,Qingdao 266033,China)
出处 《节能技术》 CAS 2024年第1期52-57,共6页 Energy Conservation Technology
基金 国家自然科学基金资助项目(52074176) 山东省自然科学基金(ZR2020ME106)。
关键词 碳排放 地铁 盾构 物化阶段 节能减排 carbon emission metro shield physicochemical stage energy conservation and emission reduction
  • 相关文献

参考文献6

二级参考文献105

共引文献159

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部