摘要
拟建抗旱水源水库大坝工程坝址比选,是拟建抗旱水源水库大坝工程规划设计的基础支撑和核心技术环节,对拟建抗旱水源水库枢纽工程建设具有十分重要的工程意义。为此,结合夏馆镇黄靳村栗坪河上拟建抗旱水源水库大坝工程坝址比选典型实践案例展开分析研究。结果表明,熟悉工程概况,围绕已经选定的拟建抗旱水源水库大坝上、下坝址方案,从工程地质条件、占地移民、工程总体布置、施工交通条件及工程投资比较等方面综合比较分析,完成拟建水库坝址比选,优选下坝址作为推荐方案。可为类似工程实践提供借鉴参考。
The dam site selection of the proposed drought-resistant water source reservoir dam project is the basic support and core technical link of the planning and design of the proposed drought-resistant water source reservoir dam project.It has great engineering significance for the proposed drought-resistant water source reservoir hub project.Therefore,the typical practice cases of the dam site of drought-resistant water source reservoir dam project on Liping River in Huangjin Village,Xiaguan Town.The results show that the project situation is familiared with.Based on the selected site scheme of the proposed drought-resistant water source reservoir dam,the site selection of the proposed reservoir dam is completed from the aspects of engineering geological conditions,migration,the overall layout,construction traffic conditions and engineering investment comparison.It can provide a reference for similar engineering practice.
作者
王亚楠
WANG Yanan(Henan Lingjie Water Conservancy Survey,Design and Research CO.LTD.,Nanyang 473000,China)
出处
《河南水利与南水北调》
2024年第1期51-52,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
拟建抗旱水源水库工程
大坝
坝址比选
proposed drought-resistant water source reservoir project
dam
dam site comparison