摘要 针对南阳煤业3#煤层顶板岩层厚度大、硬度大不易垮落的问题,提出在开切眼和回采巷道同时布置爆破孔,对顶板岩层进行爆破弱化处理。采用理论分析、数值模拟的方法确定了爆破方案及爆破孔参数,并且在南阳煤业3203综放工作面进行了现场试验。结果发现,对顶板进行爆破弱化处理后,顶板岩层垮落效果良好,顶煤冒放性明显提升,顶煤回收率可达86%。 In response to the problem of thick and hard roof strata of the 3#coal seam in Nanyang Coal Industry Co.,Ltd.,which are not easy to collapse,it was proposed to arrange blasting holes at the same time in the cutting and mining roadways to weaken the roof strata through blasting.The blasting scheme and blasting hole parameters were determined by theoretical analysis and numerical simulation,and field tests were carried out at 3203 fully mechanized caving face of Nanyang Coal industry Co.,Ltd.The results show that the caving effect of roof strata is good,the caving property of top coal is obviously improved,and the recovery rate of top coal is up to 86%.
作者 师俊杰 SHI Junjie(Gaoping Kexing Nanyang Coal Industry Co.,Ltd.of Shanxi,Gaoping 048400,Shanxi,China)
出处 《能源与节能》 2024年第3期132-135,171,共5页 Energy and Energy Conservation
关键词 综放工作面 坚硬顶板 顶板弱化 顶煤回收率 fully mechanized caving face hard roof roof weakening recovery rate of top coal
  • 相关文献

参考文献5

二级参考文献33

共引文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部