摘要
研究针对石岩河防洪河道拓宽工程进行了方案研究。通过对河道现状及问题的分析,提出了向左岸拓宽和向右岸拓宽2种方案。通过比较分析,选择了向左岸拓宽方案,并进行了具体的方案设计。同时,讨论了拆迁和征地工作、上下游衔接和迁改高压线路的相关问题。最后,提出了施工计划和管理的重要性,并强调了质量控制、安全管理以及其他考虑因素。
This paper conducts a scheme study on the widening project of the Shiyan River flood control channel.Through the analysis of the current situation and problems of the river,it proposes two options:widening towards the left bank and widening towards the right bank.Through comparative analysis,a widening plan towards the left bank was selected and a specific plan design was carried out.Meanwhile,this paper discusses issues related to demolition and land acquisition,upstream and downstream connections,and relocation of high-voltage power lines.Finally,it highlights the importance of construction planning and management,and emphasizes quality control,safety management,and other considerations.
作者
洪树星
HONG Shuxing(Chaozhou Jinqiao Intermediary Service Co.,Ltd,Chaozhou 521000,China)
出处
《云南水力发电》
2024年第3期126-129,共4页
Yunnan Water Power
关键词
石岩河
防洪
河道拓宽
Shiyan River
flood control
river widening