摘要
为将运行中的小容量风力发电机组置换为大容量机组,须对其基础进行改造加固,通过扩大基础承台、增加桩基数量的方式,对原基础进行改造,使其达到新机组的承载要求。该技术方案的应用,为后续类似改造项目提供借鉴。
In order to replace the small-capacity wind turbine generator system in operation with a large capacity unit,its foundation must be modified and reinforced by expanding the foundation cap and increasing the number of pile foundations to meet the bearing requirements of the new unit.The application of this technical solution provides a reference for similar transformation projects in the future.
作者
吴泽
WU Ze(Shanghai Investigation,Design and Research Institute Co.,Ltd.)
出处
《上海节能》
2024年第3期506-510,共5页
Shanghai Energy Saving
关键词
风电
机组置换
基础改造
Wind Power
Unit Replacement
Foundation Reconstruction