摘要
近年来,顶管施工技术的顶进距离不断增加,在埋深较大的工程中顶管技术也被广泛应用,需要顶管施工克服复杂地质条件限制,满足工程建设质量需求,确保工程施工效率。文章介绍了某给排水工程应用顶管技术进行长距离顶管施工的情况,分析了施工关键流程、施工操作要点,并对施工中的技术控制和问题处理措施进行了研究,旨在帮助技术人员了解顶管施工技术的要点,提升在市政给排水工程中顶管技术的应用水平,满足城市建设需求。
In recent years,the jacking distance of pipe jacking construction technology has been increasing,and pipe jacking technology has also been widely used in engineering with large burial depth.Pipe jacking construction needs to overcome the limitations of complex geological conditions,meet the quality requirements of engineering construction,and ensure engineering construction efficiency.This paper introduces the application of pipe jacking technology in long-distance pipe jacking construction of a water supply and drainage project,analyzes the key construction process and operation points,and studies the technical control and problem treatment measures in construction,aiming to help technicians understand the key points of pipe jacking construction technology,improve the application level of pipe jacking technology in municipal water supply and drainage engineering,and meet the needs of urban construction.
作者
王宇瑛
WANG Yuying(China Railway Fifth Survey and Design Institute Group Co.,Ltd.,Beijing 102600,China)
出处
《工程技术研究》
2024年第2期112-114,共3页
Engineering and Technological Research
关键词
市政给排水工程
顶管技术
长距离顶管
工作井
municipal water supply and drainage engineering
pipe jacking technology
long-distance pipe jacking
working well