摘要
针对铁路繁忙干线下既有框架桥拆除工程工期长、施工步骤烦琐、施工质量不达标等问题,结合萧甬铁路过水桥(73^(#))桥扩孔改造工程实例,在了解工程背景的基础上,从施工工序、施工方法两个层面论述了顶推拆除施工设计方案。结果显示:顶推拆除施工效果具有效率高、环保和铁路设备安全可控的优势,这就表明顶推拆除施工技术对铁路繁忙干线下既有框架桥拆除工程非常适用,大大降低对铁路繁忙干线运行及道路交通的影响。
Aiming at the problems of long construction period,complicated construction steps and substandard construction quality of the existing frame bridge under the busy railway trunk line,combined with the reaming reconstruction project of Xiao-Yong railway water bridge(No.73 bridge),on the basis of understanding the engineering background,this paper discusses the design scheme of incremental demolition construction from two aspects of construction process and construction method.The results show that the jacking demolition construction effect has the advantages of high efficiency,environmental protection and safe and controllable railway equipment,which shows that the jacking demolition construction technology is very suitable for the demolition of existing frame bridges under busy railway trunk lines,greatly reducing the impact on the operation of busy railway trunk lines and road traffic.
作者
方宇
陈伟华
石荣荣
马飞
开永旺
FANG Yu;CHEN Wei-hua;SHI Rong-rong;MA Fei;KAI Yong-wang(Zhejiang Railway Construction Engineering Co.Ltd.,Hangzhou 310000,China;Zhejiang Institute of Communications,Hangzhou 311112,China)
出处
《工程建设与设计》
2024年第4期166-168,共3页
Construction & Design for Engineering
基金
上海铁路局科研项目(2022209)
浙江省教育厅一般科研项目(Y202250220)。
关键词
铁路繁忙干线
既有框架桥
顶推拆除
施工工艺
施工效果
Jbusy trunk line ofrailway
existing frame bridge
jacking demolition
construction technology
construction effect