摘要
为了控制施工成本和交付工期,提高施工效率和工程质量,对管线综合布置平衡技术在空客A320项目中的具体应用进行了探讨,从管线基本布置、预装电子图、精心设计节点图、选用综合支吊架、合理安排施工顺序等方面对此项技术的应用进行阐述。
In order to control the construction cost and delivery period,improve the construction efficiency and project quality,this paper discusses the specific application of pipeline comprehensive layout balancing technology in Airbus A320 project,and expounds the application of this technology from many aspects,such as the basic layout of pipelines,the pre-assembly of electronic drawings,the fine design of node diagrams,the selection of comprehensive supports and hangers,and the reasonable arrangement of construction sequence.
作者
唐宇轩
TANG Yu-xuan(China Civil Engineering Construction Corporation,Beijing 100000,China)
出处
《工程建设与设计》
2024年第4期211-213,共3页
Construction & Design for Engineering
关键词
管线
综合平衡技术
电子图预装配
综合支吊架
Jpipeline
comprehensive balance technology
electronic drawing pre-assembly
integrated support hanger