冻土地区路面水泥稳定砂砾桩配合比设计研究

Study on Mix Ratio Design of Cement Stabilized Sand Gravel Pile in Frozen Soil Area
下载PDF
导出
摘要 在寒冷的冻土地区,施工季节的气温仍然较低,有些地方甚至在夜间会达到0℃以下,这导致实际施工条件与室内的预期标准相差很大,因此,水泥稳定砂砾桩设计方法与传统的设计方法有许多不同之处。基于此,论文根据现场条件从原材料选定、无侧限抗压强度试验、试验配合比、生产配合比及制作注意事项5个方面,详细介绍了冻土地区路面水泥稳定砂砾桩配合比的设计过程。 In cold permafrost areas,the temperature during the construction season is still relatively low,and in some places it may even reach negative temperatures at night,which leads to a significant difference between the actual construction conditions and the expected in-door standards.Therefore,there are many differences between the design methods and the usual ones.Based on this,this article provides a detailed introduction to the design process of cement stabilized gravel pile mix proportion for pavement in permafrost areas,based on five aspects:selection of raw materials,unconfined compressive strength test,test mix proportion,production mix proportion,and production precautions,based on on-site conditions.
作者 崔小龙 CUI Xiao-long(Shanxi Changzhi Highway Survey and Design Institute Co.Ltd.,Changzhi 046000,China)
出处 《工程建设与设计》 2024年第5期133-135,共3页 Construction & Design for Engineering
关键词 冻土地区 水泥稳定砂砾 生产配合比 permafrost region cement stabilized gravel production mix proportion
  • 相关文献

参考文献5

二级参考文献14

  • 1.JTJ034-93.公路路面基层施工技术规范[S].,1993..
  • 2.JTJ057-94.公路工程无机结合料稳定材料试验规程[S].,1994..
  • 3.JTJ071-98.公路工程质量检验评定标准[S].,1998..
  • 4.JTJ034-2000.公路路面基层施工技术规范[S].,2000..
  • 5FFJ071-98.公路工程质量检验评定标准[S].[S].,..
  • 6JTJ034-93.公路路面基层施工技术规范[S].[S].,..
  • 7JTJ034—2000.公路路面基层施工技术规范[S].[S].,..
  • 8JTJ057-94.公路工程无机结合料稳定材料试验规程[S].[S].,..
  • 9游国兰,林绣贤.半刚性基层材料最佳含水量与最大干密度快速确定法的应用[J].华东公路,1997(4):3-8. 被引量:12
  • 10鹿中山,杨树萍.沥青路面的施工质量控制[J].合肥工业大学学报(自然科学版),2001,24(3):397-403. 被引量:47

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部