铁路连续梁节段装配关键施工技术

Key Assembly Construction Technology of Railway Continuous Beam Segment
下载PDF
导出
摘要 结合新建连徐州铁路工程对铁路连续梁节段预制装配施工技术进行研究。论文阐述节段拼装的优势,对比分析3种拼装设备及两种拼装工法,详细介绍节段拼装关键技术及架梁线形控制措施,探讨梁端拼接结构胶的质量控制及选取方法以及临时张拉和质量控制措施。 The construction technology of prefabrication of continuous railway beams was studied based on a case study of the new Lianyungang to Xuzhou railway.This paper expounds the advantages of segmental assembly,compares and analyzes three kinds of assembling equipment and two kinds of assembling construction methods,introduces the key technologies of segmental assembly and the control measures of beam alignment,analyzes the quality control and selection method of beam end splicing structural adhesive,and introduces the temporary tensioning and quality control measures.
作者 丁卫林 DING Wei-lin(China Railway Beijing Engineering Group Co.Ltd.,Hangzhou 311215,China)
出处 《工程建设与设计》 2024年第5期190-194,共5页 Construction & Design for Engineering
关键词 铁路连续梁 预制装配 关键技术 railway continuous beam prefabricated assembly key technology
  • 相关文献

参考文献2

二级参考文献3

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部