期刊文献+

城镇污水处理管道顶管施工及质量控制研究

Research on Pipe Jacking Construction and Quality Control of Urban Sewage Treatment Pipeline
下载PDF
导出
摘要 探讨了污水处理管道的基本功能和重要性,阐述了管道材料和设计标准,以及管道布局与规划的基本原则,详细分析了顶管施工的关键设备与技术,包括顶管机的选择与操作、导向系统的重要性,以及土壤条件对施工的影响,并针对城镇污水处理管道顶管施工讨论了管线迁改的必要性、不同管道施工工法的选择、管道安装及其试验方法,以及管网附属构筑物的施工,重点分析了顶管施工的质量控制要点,为确保施工质量提供了全面的指导。 The paper explores the basic functions and importance of sewage treatment pipelines,elaborates on pipeline materials and de-sign standards,as well as the basic principles of pipeline layout and planning.It analyzes in detail the key equipment and technology of pipe jacking construction,including the selection and operation of pipe jacking machines,the importance of guiding systems,and the impact of soil conditions on construction.It also discusses the necessity of pipeline relocation for urban sewage treatment pipeline jacking construction,the selection of different pipeline construction methods,pipeline installation and testing methods,as well as the construction of ancillary structures in the pipeline network.The key points of quality control of pipe jacking construction are analyzed,which provides compre-hensive guidance for ensuring construction quality.
作者 高洁 GAO Jie(The 1st Enigineering Branch of CRCC Harbour&Channel Engineering Bureau Group Co.Ltd.,Guangzhou 511442,China)
出处 《工程建设与设计》 2024年第5期226-228,共3页 Construction & Design for Engineering
关键词 城镇 污水处理管道 顶管施工 urban sewage treatment pipeline pipe jacking construction
  • 相关文献

参考文献2

二级参考文献5

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部