期刊文献+

橡胶坝积气和尾水故障分析及抽排系统设计

Causes of Accumulated Air and Tailwater Malfunctions in Rubber Dam and Design of a Pumping and Drainage System
下载PDF
导出
摘要 充水式橡胶坝在充水后坝袋内顶部常有积气无法彻底排除,塌坝泄洪时坝袋底部常有尾水无法彻底排除。为解决这两项常见故障,在分析故障产生的原因及可能引发的一系列后果的基础上,发明了橡胶坝积气和尾水抽排系统,提出了抽排管路、抽排动力装置和控制系统的概念设计原理和方法。通过典型应用实例验证了该系统能有效排除积气和尾水故障及其引发的一系列问题,保障橡胶坝工程能够以最大高度蓄水,以最大过水断面泄洪,为橡胶坝工程精细化设计及改进传统设计方案提供了创新思路。 In water-filled rubber dams,air often accumulates at the top of the dam bag following water filling,which is challenging to completely remove.Similarly,when the rubber dam collapses and discharges water,residual tailwater frequently remains at the bottom of the dam bag,resisting complete discharge.To tackle these common problems,a system for efficiently pumping and discharging accumulated air and tailwater in rubber dams has been developed.Based on an analysis of the underlying causes and potential consequences of these problems,this paper introduces conceptual design principles and methodologies for the pumping and discharging pipeline,power device,and control system.Through verification via typical application examples,it has been demonstrated that this system effectively mitigates faults caused by accumulated air and tailwater along with associated challenges,and also ensures the rubber dam impounds at maximum water level and discharges at maximum discharge section.This innovation offers valuable insights for the meticulous design of rubber dam projects and the enhancement of traditional design approaches.
作者 王兴超 WANG Xing-chao(Yantai Operation and Maintenance Center for Urban Water Source Projects,Yantai 264004,China)
出处 《长江科学院院报》 CSCD 北大核心 2024年第4期181-186,193,共7页 Journal of Changjiang River Scientific Research Institute
关键词 橡胶坝 积气 尾水 抽排系统 故障分析 运行管理 结构设计 rubber dam accumulated air tailwater pumping and drainage system fault analysis operation management structural design
  • 相关文献

参考文献19

二级参考文献80

共引文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部