期刊文献+

基于服装吊挂系统协同的车间混合流水线布局优化

Optimization of mixed production line layout for collaborative clothing suspension system
下载PDF
导出
摘要 为适应服装生产企业转型,针对服装制造车间混合流水线生产存在吊挂系统的物料传输路径耗时耗能、各工作台作业负荷时间不均、加工周期长及加工设备资源浪费等问题,根据服装生产工艺流程、工作台资源和加工设备数量受限、理性生产节拍等约束条件,建立物料传输总距离极小化及平滑系数极小化的双目标数学规划模型;设计非支配遗传(NSGA-Ⅱ)算法,对多款式服装生产具体实例进行编程仿真求解,并与多目标粒子群(MOPSO)算法进行优化对比。研究结果表明:NSGA-Ⅱ算法拥有更好的寻优能力,实验得到最优总距离为82 m、最优平滑系数为21.977、最优编制效率为90.2%、最少只需要打开10个工作台和使用18台加工设备,企业可根据不同目标的需要择优选出相应的布局编排方案。 Objective In order to adapt to the transformation and upgrading of clothing manufacturing enterprises,and quickly respond to market demand,most clothing manufacturing enterprises had introduced many intelligent production equipment such as clothing suspension systems to replace conventional backward bundled assembly line production.In order to apply new production equipment in the actual production,some problems were identified for the mixed assembly line in the clothing manufacturing workshop such as unreasonable suspension system material transmission path,time consumption and energy consumption,uneven workload time of each workbench,long processing cycle,and waste of processing equipment resources.The optimization of workshop assembly line layout considering the collaboration of clothing suspension systems was carried out aiming to effectively solve the above-mentioned problems of clothing production lines.Method Because of the involvement of multiple disciplines such as clothing,logistics,and operations research,as well as the complexity of the production process,it was necessary to conduct on-site investigations,observe the production line process of clothing production,analyze the production process diagram of clothing production enterprises and the raw data in MES systems.Based on the constraints of the clothing production process,limited workbench resources and processing equipment quantity,and rational production rhythm,a dual objective mathematical programming model was established to minimize material transmission distance and smoothness coefficient.The non-dominant sorting genetic(NSGA-Ⅱ)algorithm was designed and applied to solve the production lines of multi-style clothing.Results From the optimization objective iteration curve generated using NSGA-Ⅱ algorithm,it was found that the algorithm had a good optimization effect on the green mixed clothing assembly line,and the total distance and smoothness coefficient of material transmission had converged to a stable level in over 300 generations.Based on the production data examples,the Pareto optimal solution set was obtained.Because of the two objectives of the total distance of material transmission and the smoothing coefficient,a non-dominated solution with the best total distance and the non-dominated solution with the best smoothing coefficient were extracted from the solution set for analysis.When 12 workstations are operational and 21 processing devices are utilized,the average idle time per workstation amount to 42.2 s,resulting in an optimal total distance of material transport measuring 82 m.However,the smoothness coefficient stands at 55.86 and the compilation efficiency is merely 75.2%.Conversely,when operating with only 10 workstations and utilizing 18 processing devices,each workstation experiences an average idle time of approximately 16.6 s while achieving a smoother coefficient of 24.104.This leads to an improved compilation efficiency of up to 90.2%,albeit at the expense of increased material transport distance reaching a value of approximately 100 m.The total distance of material transmission in the minimum production cycle was 82 m,with a smoothness coefficient of 55.86,and 12 workstations were needed with 21 processing equipment.The average idle time of each workbench was 42.2 s,and the staffing efficiency was 75.2%.The total transmission distance of the material was 100 m,and the smoothness coefficient was 21.977.It was necessary to operate 10 workstations with 18 processing equipment.The idle time of each workbench was 16.6 s,and the staffing efficiency was 90.2%.The Gantt chart of the work tasks for each workstation in the mixed clothing assembly line were generated according to the scheme.In order to verify the effectiveness of the model,NSGA-Ⅱ algorithm and multi-objective particle swarm optimization(MOPSO)algorithm were compared,and the result showed that NSGA-Ⅱ algorithm produced closer simulation results.Conclusion Faced with the transformation of the clothing industry structure,the design of the entire production line plays a crucial role in intelligent clothing manufacturing.The optimization of workshop assembly line layout considering the synergistic effect of clothing suspension system helps promote the transformation and it is useful for upgrading of China′s clothing and textile industry from labor-intensive to less labor intensive or unmanned production.This study provides some theoretical reference for the promotion of green and intelligent manufacturing in the clothing enterprises.
作者 童锡宇 郑路 杨金昌 胡觉亮 韩曙光 TONG Xiyu;ZHENG Lu;YANG Jinchang;HU Jueliang;HAN Shuguang(School of Economics and Management,Zhejiang Sci-Tech University,Hangzhou,Zhejiang 310018,China;High Fashion(China)Co.,Ltd.,Hangzhou,Zhejiang 311200,China;School of Science,Zhejiang Sci-Tech University,Hangzhou,Zhejiang 310018,China)
出处 《纺织学报》 EI CAS CSCD 北大核心 2024年第3期169-176,共8页 Journal of Textile Research
基金 国家自然科学基金项目(12071436)。
关键词 双目标布局优化 服装吊挂 服装车间 混合流水线 NSGA-Ⅱ算法 节能增效 two-objective layout optimization clothing hanging clothing workshop mixing assembly line NSGA-Ⅱalgorithm energy saving and efficiency improvement
  • 相关文献

参考文献8

二级参考文献78

  • 1金芳,方凯,王京林.基于排队论的AGV调度研究[J].仪器仪表学报,2004,25(z1):844-846. 被引量:20
  • 2曾三友,李晖,丁立新,姚书振,许中华.基于排序的非劣集合快速求解算法[J].计算机研究与发展,2004,41(9):1565-1571. 被引量:8
  • 3吴秀丽,孙树栋,余建军,张红芳.多目标柔性作业车间调度优化研究[J].计算机集成制造系统,2006,12(5):731-736. 被引量:59
  • 4何彦,刘飞,曹华军,刘纯.面向绿色制造的机械加工系统任务优化调度模型[J].机械工程学报,2007,43(4):27-33. 被引量:37
  • 5鞠全勇,朱剑英.多目标批量生产柔性作业车间优化调度[J].机械工程学报,2007,43(8):148-154. 被引量:64
  • 6郑金华.多目标进化算法及其应用.北京:科学出版社,2010:2-11.
  • 7XING Lining, CHEN Yingwu, YANG Kewei. Multi-objective flexible job shop schedule: design and evaluation by simulation modeling[J]. Applied Soft Computing,2009,9(1):362-376.
  • 8ZHANG Guohui, SHAO Xinyu, LI Peigen, et ak An effec- tive hybrid particles warm optimization algorithm for multi-ob- jective flexible job shop scheduling probleml-J. Computers Industrial Engineering, 2009,56(2) : 1309-1318.
  • 9GHASEM M, MEHDI M. A Pareto approach to multi-objec- tive flexible job-shop scheduling problem using particle swarm optimization and local search [J]. International Journal of Production Economics, 2011,129 ( 1 ) : 14-22.
  • 10FONSECA C M, FLEMING P J. Genetic algorithms for multiohjective optimization: formulation, discussion and gen- eralization[C]//Proceedings of the 5th International Confer- ence on Genetic Algorithms. San Francisco, Cal. , USA: Mor- gan Kaufmann, 1993 : 416-423.

共引文献130

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部