浅谈某尾矿库排水管承载能力复核计算

Discussion on Checking Calculation of Bearing Capacity of Drainage Pipe in a Tailings Pond
下载PDF
导出
摘要 排水管是尾矿库排洪系统的重要输水构筑物,其结构形式多为钢筋混凝土结构。近些年,由于排水管结构强度的降低导致排洪系统失效是引起尾矿库安全事故的主要原因之一。本文介绍了某尾矿库闭库后,对库内已建排水管结构承载能力进行复核。通过对排水管承受的荷载计算和有限元分析,已建排水管承载力满足闭库后使用要求。 Drainage pipes are the vital water conveyance structure within the tailings pond flood discharge system,typically taking the form of reinforced concrete structures.In recent years,the reduced structural strength of drainage pipes leading to flood discharge system failure has been one of the main causes of safety incidents in tailings ponds.This paper presents a reevaluation of the load-bearing capacity of the established drainage pipe structures within a tailings pond after its closure.Through load calculations and finite element analysis performed on the drainage pipes,it was found that the existing structures have a load-bearing capacity that meets the requirements for use after the pond closure.
作者 程立家 李旅 CHENG Lijia;LI Lu(Kunming Engineering&Research Institute of Nonferrous Metallurgy Co.,Ltd.,Kunming Yunnan 650051,China)
出处 《有色金属设计》 2024年第1期18-20,共3页 Nonferrous Metals Design
关键词 尾矿库 排水管 承载能力 Tailings pond Drainage pipe Bearing capacity
  • 相关文献

参考文献6

二级参考文献4

  • 1SL191-2008,水工混凝土结构设计规范[S].
  • 2GB50863—2013.尾矿设施设计规范[S].
  • 3陈青.尾矿坝设计手册(上册)[M].北京:冶金工业出版社.2007.
  • 4秦建设,吕国君.太沙基隧道松动土压力研究[J].施工技术,2007,36(S1):390-392. 被引量:13

共引文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部