摘要
通过对某金矿提升系统现状的研究,提出了2个可行的技术方案,对两个方案在技术上和经济上进行较为详细的比较,分析其各自的优缺点,最后推荐新建一条混合井兼具主提升系统和辅助提升系统功能,改造原有竖井作为辅助提升系统的一部分。并且阐述了推荐方案中提升系统设备选型和提升系统辅助设施设计思路,为以后相似工程设计提供借鉴。
Through the research on the current situation of a gold mine's lifting system,two feasible technical schemes are proposed,the two schemes were compared in detail in terms of technology and economy,and their respective advantages and disadvantages were analyzed.Finally,a new mixed shaft was recommended with both the main lifting system and the auxiliary lifting system functions,and the original shaft is reformed as a part of the auxiliary lifting system.The selection of lifting system equipment and the design of lifting system auxiliary facilities in the recommended scheme were also discussed to provide reference for the future similar engineering.
作者
王悦
WANG Yue(Shenyang Nonferrous Metallurgy Design and Research Institute Co.,Ltd.,Shenyang 110003,China)
出处
《有色矿冶》
2024年第2期16-19,共4页
Non-Ferrous Mining and Metallurgy
关键词
提升系统
混合井
主提升系统
辅助提升系统
lifting system
mixed shaft
main lifting system
auxiliary lifting system