摘要
对连铸机设备安装施工过程的要点进行分析,详细阐述了连铸机钢包回转台、结晶器及振动装置、拉矫机、液压系统和辊道的安装流程、安装技术要求。通过现场安装连铸机生产线设备,不仅充分了解了设备的结构和运行原理,而且积累了安装经验,为设备后续的正常运转、维修保养奠定了基础。
This article analyzes the key points of the installation and construction process of continuous casting machine equipment,and elaborates in detail on the installation process and technical requirements of the ladle turntable,crystallizer and vibration device,straightening machine,hydraulic system and roller conveyor.By installing the continuous casting machine production line equipment on site,not only did the structure and operating principle of the equipment been fully understand,but also the installation experience is accumulated,laying a foundation for the subsequent normal operation and maintenance of the equipment.
作者
杨大勇
曹钦
Yang Dayong;Cao Qin(Equipment Department of Shougang Changzhi Steel&Iron Co.,Ltd.,Changzhi Shanxi 046031,China)
出处
《山西冶金》
CAS
2024年第2期201-203,共3页
Shanxi Metallurgy
关键词
连铸机
结晶器
拉矫机
液压系统
continuous casting machine
crystallizer
straightening machine
hydraulic system