摘要
在确保安全性、先进性的前提下,大幅提升经济性是未来核电机型研发的重点方向,为此,核电机型研发工作已开始提出明确的经济性指标要求。本文针对核电机型研发提出的经济性指标,研究如何将这一总体指标分解到具体工作执行层面,提出了一种适用于核电机型研发的经济性指标分解方法,解决机型研发经济性指标无法落实到具体设计专业的问题。通过实例分析,验证了这一方法的合理性和可实施性。
On the premise of ensuring safety and progressiveness,significantly improving the economy is the key direction of future nuclear power model research.For this reason,the research and development of nuclear power model has begun to put forward clear requirement for economic indicator.This article focuses on how to decompose the top-level economic indicator and proposes an economic indicator decomposition method suitable for nuclear power model research and development to solve how to implement economic indicator.Through case analysis,the rationality and feasibility of this method have been verified.
作者
陈向婷
赖晓丰
法丹
李文安
荣梅
CHEN Xiang-ting;LAI Xiao-feng;FA Dan;LI Wen-an;RONG Mei(China Nuclear Power Engineering Co.,Ltd.,Beijing 100840,China)
出处
《价值工程》
2024年第11期17-19,共3页
Value Engineering
关键词
核电机型研发
经济性指标
指标分解
nuclear power model research and development
economic indicator
indicator decomposition