从水利工程建筑堤防的施工流程出发,将水利工程堤防施工方法拆解为施工前准备与施工中技术应用两部分。施工前准备以堤防建筑施工材料的准备、填筑施工、辅料施工为主要内容;施工中技术应用以施工程序把控、清基施工技术、堤段削坡土方加固、开挖河道土方施工作业、填塘施工、旧堤加固为主要内容,通过将水利工程建设中的堤防施工技术进行拆解分析施工过程中的技术注意点。
Based on the construction process of water conservancy project dike,this study divides the construction method of water conservancy project dike into two parts:preparation before construction and technical application during construction.Before construction,the main contents are the preparation of construction materials,filling construction and auxiliary materials construction.The main contents of technical application in construction are construction procedure control,foundation cleaning construction technology,slope cutting earthwork reinforcement of embankment section,earthwork excavation of river course,pond flling construction and old embankment reinforcement.Through dismantling the dike construction technology in water conservancy project construction,the technical points for attention in the construction process are analyzed.
作者
李昂
张晓云
LI Ang;ZHANG Xiao-yun(East Route of South-to-North Water Transfer Project Shandong Main Line Co.Ltd.,Ji'nan 250013,China;Shandong Survey and Design Institute of Water Conservancy Co.Ltd.,Ji'nan 250013,China)
出处
《工程建设与设计》
2024年第6期203-205,共3页
Construction & Design for Engineering
关键词
水利工程
堤防加固
填筑施工
河道导流
water conservancy project
dike reinforcement
filling construction