摘要 航道工程施工控制网是运河建设的重要课题。以平陆运河工程施工控制网的建立为例,根据枢纽建筑物施工放样的精度要求,确定平面控制网和高程控制网的等级。采用先进的测量仪器,快速完成控制网的外业数据采集,利用广西连续运行参考站(GXCORS)测量数据,集中统一处理全球导航卫星系统(GNSS)数据。高效率完成了施工控制网技术设计、外业数据采集、内业数据处理、精度分析、成果提供等全部生产过程。 The construction control network of waterway engineering is an important issue in canal construction.Taking the establishment of Pinglu Canal construction control network as an example,we determine levels of horizontal control network and elevation control network based on the precision requirements of the construction layout of hub buildings.We quickly complete the field data collection of the control network by advanced measuring instruments,and use the measurement data of Guangxi continuous operating reference station(GXCORS)to centrally and uniformly process GNSS data,so as to efficiently complete the production processes of construction control network technology design,field data collection,internal data processing,accuracy analysis,and achievement provision.
作者 王萧寒 花斌 黄勇清 卢军民 王家文 李建委 王俊刚 WANG Xiaohan;HUA bin;HUANG Yongqing;LU Junmin;WANG Jiawen;LI Jianwei;WANG Jungang(CCCC Water Transportation Consultants Co.,Ltd.,Beijing 100007,China)
出处 《水运工程》 2024年第4期196-201,共6页 Port & Waterway Engineering
关键词 平陆运河工程 施工控制网 GXCORS 精度 Pinglu Canal project construction control network GXCORS precision
  • 相关文献

参考文献5

二级参考文献18

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部