摘要 “双层软弱地基”地层结构常见于江海湖湾地区,一般地表为3~5 m厚的水力冲填土,以松散、不均匀的粉土、粉砂为主,其下为孔隙比大、压缩性高、强度低的淤泥质土。大面积处理“双层软弱地基”常采用降水联合低能级强夯法,本文以江苏南通通州湾江海联动开发示范区建设制造基地项目为例,详细介绍了强夯法试验概况,对监测与检测成果进行了分析,结合工程实践提出了几种新的地基处理思路,可供同类项目参考。 The stratigraphic structure of“double-layer soft ground”is commonly encountered in the riverside,lakeside or gulf area.Typically,there exists a 3-5 m thick layer of hydraulic dredger fill on the surface,comprising primarily loose and uneven silt and silty sand.Beneath this layer,there is a layer of mucky soil characterized by a significant void ratio,high compressibility and low strength.Large-scale treatments for“double-layer soft ground”often employ a combination of dewatering and low-energy dynamic compaction.This work utilizes the construction and manufacturing base project in the Tongzhou Bay River-Sea Linkage Development Demonstration Zone,located in Nantong,Jiangsu,as a case study.This work provides a comprehensive analysis of dynamic compaction testing and the subsequent evaluation of monitoring and testing results.Additionally,the work introduces innovative foundation treatment strategies derived from engineering practice.These strategies offer valuable guidance for similar projects.
作者 雷胜全 梅广冬 王鑫 李彪 LEI Sheng-quan;MEI Guang-dong;WANG Xin;LI Biao(Hai’an Construction Engineering Construction Drawing Review Office,Nantong 226600,Jiangsu,China;China Railway 14th Bureau Fifth Engineering Co.,Ltd.,Jining 272100,Shandong,China)
出处 《地基处理》 2023年第S02期62-68,共7页 Journal of Ground Improvement
关键词 监测与检测 试验区 强夯法 双层软弱地基 冲填土 淤泥质土 monitoring and testing test area dynamic compaction double-layer soft ground dredger fill mucky soil
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部