本文通过对公司在用岸桥吊具电缆卷盘变频器损坏时发现的问题,对变频器进行换型可行性分析,直到项目实施中出现的问题以及解决情况进行逐一论述。
In this paper,through the problems found when the inverter of the cable reel of the ship-to-shore crane spreader is damaged,the feasibility analysis of the inverter is carried out,and the problems and solutions in the implementation of the project are discussed one by one.