摘要
梯级泵站在调水、灌溉与生态修复等建设中发挥了巨大作用。为提高梯级泵站运行效率、节约运行费用,结合某梯级泵站明渠引水工程,以总效率最高为目标建立了梯级泵站优化调度模型,提出了一种基于龙格库塔算法(RUN)的优化调度方法。计算结果表明,与该泵站现状运行方案相比,采用RUN算法计算所得方案可提高运行效率0.73%,节省运行费用271195元/年,优于利用PSO、GA算法所得优化结果,证实了所提方法可良好地服务于梯级泵站优化运行。
Cascade pump stations play a significant role in modern construction projects such as water diversion,irrigation,and ecological environment restoration.In order to promote the efficiency of cascade pump station operation and save operation costs,a scheduling method based on the Runge-Kutta optimization algorithm(RUN)is proposed.Considering a cascade pump station water diversion project,an optimization scheduling model is established with the goal of the highest overall efficiency.Compared with the current operating scenario,the results indicate that the scheme obtained by RUN can improve the operating efficiency by 0.73%and save operating costs by 271,195 yuan/a,which is better than the results obtained by the PSO and GA algorithms,confirming that the proposed algorithm is able to serve the optimization operation of cascade pump stations well.
作者
李贞蓉
张雷克
刘小莲
王雪妮
田雨
LI Zhen-rong;ZHANG Lei-ke;LIU Xiao-lian;WANG Xue-ni;TIAN Yu(College of Water Resources Science and Engineering,Taiyuan University of Technology,Taiyuan 030024,China;School of Civil Engineering,Tianjin University,Tianjin 300350,China;Henan Key Laboratory of Water Resources Conservation and Intensive Utilization in the Yellow River Basin,Zhengzhou,450046,China;State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin,China Institute of Water Resources and Hydropower Research,Beijing 100038,China)
出处
《水电能源科学》
北大核心
2024年第4期164-167,141,共5页
Water Resources and Power
基金
国家自然科学基金项目(52379091)
山西省基础研究计划项目(20210302124645,202103021224086,202203021222112)
河南省黄河流域水资源节约集约利用重点实验室开放研究基金项目(HAKF202104)。
关键词
龙格库塔算法
梯级泵站
优化调度
经济运行
Runge-Kutta algorithm
cascade pumping station
optimal scheduling
economic operation