5Bosh Ell F, Veloza O P. Review of developed demand side manage- ment programs including different concepts and their results [ C ]//Proceed- ings of IEEE Transmission and Distribution Conference and Exposition. Bogo- ta, Columbia: IEEE,2008 : 13 - 15.
6Billinon R, Baig. Generating capacity adequacy associated with wind energy[ J]. IEEE Trans. on Energy Conversion,2004,19 ( 3 ) :641 - 646.
7Armando M Leite da Silva, Warlley S Sales, Luiz Ant6nio da Fonseca Manso,et al. Long-term probabilistic evaluation of operating reserve require- ments with renewable sources [ J ]. IEEE Trans. on Power System, 2010,25 (1) :106 -116.
8Kaigui X, BiUinton R. Determination of the Optimum Capacity and Type of Wind Turbine Generators in a Power System Considering Reliability and Cost [ J ]. IEEE Transactions on Energy Conversion,2011,26 ( 1 ) :227 - 234.
9Yang P, Tang G, Nehorai A. A game - theoretic approach for optimal time-of-use electricity pricing [ J ]. IEEE Transactions on Power Systems, 2013,28(2) :884 - 892.
10WALAWALKAR R, BLUMSACK S, APT J, et al. An economic wel- fare analysis of demand response in the PJM electricity market [ J ]. Energy Policy,2008,36 ( 6 ) : 3692 - 3702.