水利工程施工进度控制与成本管理是确保工程顺利进行和控制成本的关键因素。文章通过对进度控制理论和成本管理理论的探讨,分析了水利工程施工进度控制与成本管理的现状,并指出存在的问题。提出了水利工程施工进度控制策略,包括制订详细的施工计划、实施进度监控、引入里程碑管理、建立有效的沟通机制等。还提出了制订合理的预算、精细化的成本控制、引入绩效评估机制、加强供应链管理等成本管理策略。最后,强调了进度控制与成本管理的协同策略,包括风险管理、信息共享、持续改进和预测与调整,旨在为水利工程施工中的进度控制与成本管理提供理论基础和实践指导。
Water conservancy project construction schedule control and cost management are the key factors to ensure the smooth progress of the project and control costs.Firstly,through the discussion of schedule control theory and cost management theory,this paper analyzes the current situation of construction schedule control and cost management of water conservancy projects,and points out the existing problems.Secondly,the construction schedule control strategy of water conservancy project is put forward,including formulating detailed construction plan,implementing schedule monitoring,introducing milestone management,establishing effective communication mechanism and so on.It also proposes cost management strategies such as formulating a reasonable budget,refined cost control,introducing a performance evaluation mechanism,and strengthening supply chain management.Finally,the collaborative strategy of schedule control and cost management is emphasized,including risk management,information sharing,continuous improvement and prediction and adjustment,aiming to provide theoretical basis and practical guidance for schedule control and cost management in water conservancy project construction.
作者
鲁智国
LU Zhiguo(Dingxi Dayu Water Saving Co.,Ltd.,Dingxi 743000,Gansu,China)
出处
《工程技术研究》
2024年第3期155-157,共3页
Engineering and Technological Research
关键词
水利工程
施工进度控制
成本管理
water conservancy engineering
construction progress control
cost control