期刊文献+

驮英水库泄洪建筑物方案比选

Comparison and selection of flood-relief structure schemes for Tuoying Reservoir
下载PDF
导出
摘要 驮英水库需进行泄洪建筑物方案布置比选,首先采用“单独溢洪道”与“溢洪道+泄洪洞”联合泄洪等两种泄洪方式从结构安全、运行调度、防汛抢险、工程投资等方面进行比选,确定“溢洪道+泄洪洞”联合泄洪的泄洪方式。从结构安全、运行调度、防汛抢险、工程投资等方面对“左岸溢洪道”及“右岸溢洪道”进行方案比选,最终确定水库的泄洪建筑物的布置方案。 For the design of flood-relief structure of Tuoying Reservoir,the joint flood discharging scheme consisting of overflow spillway and spillway tunnel was selected after it was compared with the single overflow spillway alternative in respects of structural safety,operation and control,flood protection,construction cost etc.,based on which left bank spillway scheme was compared with right spillway alternative in respects of structural safety,operation and control,flood protection,construction cost etc.before the layout scheme was determined finally.
作者 陈宇县 李娜 CHEN Yu-xian;LI Na(Beihai Hehai Water and Power Design Institute Co.,Ltd.,Beihai 536000,China;Nanning College of Vocational Technology,Nanning 530007,China)
出处 《广西水利水电》 2024年第2期74-77,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 单独溢洪道 溢洪道+泄洪隧洞 泄洪方案 驮英水库 single overflow spillway overflow spillway and spillway tunnel flood discharging scheme Tuoying Reservoir
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部