摘要
为提高鱼道的过鱼效率,在曲线边壁竖缝式鱼道基础上增加内部构造,即在鱼道内壁和底板上布置辅助过鱼装置,组合而成6种不同布置方案,并对每种布置方案进行了相应的数值模拟和模型试验,探究不同布置方案的过鱼效果。结果表明:不同隔板组合的方案1、2、3的上溯成功率分别为36.7%、43.3%、73.3%,其中以中央贯通且尾部边壁只设一组隔板的方案3试验鱼上溯成功率最高;在方案3的基础上引入不同直径圆形柱组合形成方案4、5、6,其相应的上溯成功率分别为56.7%、73.3%、90.0%,其中以圆柱直径为池室入口宽度二分之一的方案6上溯成功率最高,可作为推荐方案,同时发现鱼类游动会大致沿主流进行逆流上溯,当水流形态呈现多股主流流径,流速梯度明显,主流流速衰减平缓合理,且水流回流区较少时,有利于提升鱼类的通过性能。研究结果可丰富了道设计理念和方法,为鱼道设计建造提高参考。
Here internal structures were added into the curved side wall and vertical seam,in order to improve the fish passage efficiency of fishways.Auxiliary fish passage devices were arranged on the inner wall and bottom plate of the fishway.Six layouts were also combined to explore the effect on the fish upstream behavior using simulation and model testing.The results showed that the success rates of upstream migration were 36.7%,43.3%,and 73.3%,respectively,for the combinations of barriers in schemes 1,2,and 3.Because scheme 1 was set as more barriers,the flow velocity in the mainstream decreased rapidly to cause the vortex-like flows,where the fish was unable to identify the upstream direction.There was the a low flow velocity in the downstream half of the mainstream,leading to difficultly ascending.A group of barriers was removed perpendicular to the direction of flow in scheme 2.The mainstream flow was connected from the top to the bottom,indicating the fish upstream migration.The sScheme 3 was equipped with the a central connection and only one group of barriers on the side wall.The highest success rate was achieved for fish upstream migration.The wide distribution of mainstream flow velocity and large flow velocity differentiation were provided more selective areas for fish with the different physical abilities,thus improving the fish upstream migration.There were the hindering and disturbing effects of circular columns on the flow in the tank chamber,indicating the variation in the mainstream flow path and flow velocity distribution.There was the an increase in the mainstream branches with the upstream flow velocity decreased.The test fish was easily fieasily found the correct path.The maximum mainstream flow velocity was greatly contributed to the better better-ascending fish.An optimal number of recirculation zones were was also maintained to ensure the rest for upstream fish.The combinations(schemes 4,5,and 6)of straight circular columns were introduced in the scheme 3 to further improve the effect of fish upstream migration.The success rates were 56.7%,73.3%,and 90.0%,respectively,for the upstream migration.The internal disturbance was significant in the area that composed of internal barriers in scheme 4,resulting in a narrower middle mainstream width and lower flow velocity than on both sides.There was the a low flow velocity in the tail of the tank chamber.There was no benefit to inducing fish upstream migration.In scheme 5,the width of the middle mainstream increased,while the flow velocity in on both sides decreased.The lower flow velocity and longer distribution distance in the higher flow velocity area were promoted the fish upstream migration,while reducing the swimming difficulty.There was the a cylindrical diameter with one-half of the inlet width of the tank chamber in scheme 6.The highest success rate was then achieved for the test fish upstream migration.The middle mainstream flow velocity increased in the tank chamber.The mainstream was much clearer to fill with internal barriers.There was the a diffusion from the middle mainstream to both sides.The width of mainstream distribution increased for the fish upstream migration.In the recommended solution,the fish swimming was roughly followed the mainstream upstream,providing the multiple mainstream flow paths for fish.The pass efficiency of fish was improved with the large discrimination of flow velocity,the reasonable attenuation of mainstream flow velocity,and the flow pattern with the fewer backflow zones.
作者
康捷
吴鑫淼
王妍
郄志红
KANG Jie;WU Xinmiao;WANG Yan;QIE Zhihong(College of Urban and Rural Construction,Hebei Agricultural University,Baoding 071001,China;Nation Engineering Research for Agriculture in Northern Mountainous Areas,Baoding 071001,China;Luanping County Water Affair Bureau,Chengde 068250,China)
出处
《农业工程学报》
EI
CAS
CSCD
北大核心
2024年第5期344-350,共7页
Transactions of the Chinese Society of Agricultural Engineering
基金
国家自然科学基金项目(51709278,51679261)
河北省水利科研和推广计划项目(2018-29)。
关键词
数值模拟
水力特性
结构优化
鱼道
曲线边壁
上溯试验
numerical simulation
hydraulic characteristics
structural optimization
fishway
curve side wall
upstream test