全漂浮状态下整平船自身稳定性分析

Self-stability analysis of leveling ship under full floating condition
下载PDF
导出
摘要 针对大连湾海底隧道项目特殊地质条件,基床整平使用“津平1”进行全漂浮整平,全漂浮整平虽然可以完全避免桩腿对基础的压力,但要考虑潮汐、波浪、风等因素对船体稳定性及整平精度的影响,需要分析全漂浮状态下整平船自身稳定性。通过分析验证全漂浮整平的可行性,得出工艺参数,对后期类似工程有较大的借鉴意义。 In view of the special geological conditions of the Dalian Bay Immersed Tunnel Project,the foundation bed is leveled using the leveling ship"Jinping 1"with full floating leveling,although the pressure of the pile legs on the foundation can be completely avoided,but to consider the influence of tides,waves,wind and other factors on the stability and leveling accuracy of the hull.It is necessary to analyze the self-stability of the leveling ship under the condition of fully floating.Through the analysis and verification of the feasibility of full floating leveling,it is concluded that the process parameters have great reference significance for similar projects in the later stage.
作者 王殿文 杨伟光 WANG Dian-wen;YANG Wei-guang(No.2 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Qingdao,Shandong 266071,China;Tianjin Key Laboratory of Construction,Operation and Maintenance Technologies for Underwater Tunnels,Tianjin 300461,China)
出处 《中国港湾建设》 2024年第4期96-103,共8页 China Harbour Engineering
基金 2021年度交通运输行业重点科技项目(2021-MS1-050)。
关键词 碎石基床 整平船 全漂浮 稳定性 gravel bed leveling ship full floating stability
  • 相关文献

参考文献8

二级参考文献30

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部