摘要
膨胀性火山灰泥岩隧道逆层施工时围岩变形严重,以印尼雅万高铁6号隧道2号斜井为例,介绍膨胀性火山灰泥岩隧道大变形控制关键技术,旨在为类似隧道工程施工提供参考,以进一步提高项目建设的质量和安全。
During the excavation in the direction opposite to the inclination of the rock layer in tunnels with expansive volcanic ash mudstone,severe deformation of the surrounding rock occurs.Taking the No.2 Inclined Shaft of Tunnel 6 of the Jakarta-Bandung High-Speed Railway in Indonesia as an example,this article introduces the key techniques for controlling severe deformation in tunnels with expansive volcanic ash mudstone,aiming at providing references for the construction of similar tunnels,so as to further improve the construction quality and safety of the project.
作者
胡启升
HU Qisheng(China railway group limited jakarta-bandung high-speed railway project,Beijing 100039,China)
出处
《四川建材》
2024年第4期72-73,93,共3页
Sichuan Building Materials
关键词
隧道施工
膨胀性火山灰泥岩
变形控制
tunnel construction
volcanic ash mudstone
expansive
deformation control