摘要 在水工建筑物非岩石基础处理的诸多措施中,预应力混凝土实心方桩在工期、投资、质量控制、承载能力和沉降量控制等方面都有一定的优势。本文依托某泵站基础处理工程,系统比较分析了预应力混凝土实心方桩和混凝土灌注桩两种处理方案,并优选适合于本工程的实心方桩处理方案,有效解决了基础承载力和沉降量问题,可供其它类似工程的基础处理参考。 Among the various measures for non-rock foundation treatment of hydraulic structures,pre-stressed concrete solid square pile is of certain advantages in construction time,cost,quality control,bearing capacity and settlement control.Taking a foundation treatment work of a pumping station project as example,two treatment schemes,i.e.the pre-stressed concrete solid square pile and the concrete cast-in-place pile,are compared and analyzed systematically.The pre-stressed concrete solid square pile scheme is selected,which effectively solves the foundation bearing capacity and settlement issues and is more suitable for this project.It provides useful reference for the foundation treatment of similar projects.
作者 汤升才 黄修杰 熊伟 TANG Shengcai;HUANG Xiujie;XIONG Wei(Hubei Institute of Water Resources Survey and Design Co.,Ltd.,Wuhan 430060,China;Hubei Zhanghe Project Administration Bureau,Jingmen 448001,China)
出处 《水电与新能源》 2024年第4期34-38,42,共6页 Hydropower and New Energy
关键词 预应力 混凝土实心方桩 混凝土灌注桩 承载力 沉降 基础处理 pre-stress concrete solid square pile concrete cast-in-place pile bearing capacity settlement foundation treatment
  • 相关文献

参考文献8

二级参考文献17

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部