摘要 为解决自然崩落法放矿中覆盖层冰碛物细颗粒穿流混入带来的高贫化损失难题,采用室内放矿相似模拟试验,选取自然堆积与固结改性两种覆盖层冰碛物状态进行试验,对放矿过程中细颗粒的混入率进行统计分析。研究结果表明:自然堆积覆盖层冰碛物状态下,混入率随放矿高度增加呈幂指数增加,混入率与覆盖层细颗粒含量成正比,冰碛物覆盖层下放矿可划分为纯矿石放出、少量细颗粒快速穿流、细颗粒与矿石混合和细颗粒大量穿流放出4个阶段;固结改性覆盖层冰碛物状态下,细颗粒混入率可降低50%以上,放出矿量增加30%,固结改性是控制覆盖层冰碛物细颗粒穿流混入的有效手段。 In order to solve the problem of high depletion loss caused by the inflow of fine particles of overburden moraine during ore drawing by natural caving method,the similar simulation test of indoor ore drawing was adopted,and two overburden moraine states of natural accumulation and consolidation modification were selected for test,and the mixing rate of fine particles during ore drawing was statistically analyzed.The research results show that under the overburden moraine state of natural accumulation,the mixing rate increases exponentially with the increase of ore drawing height,and the mixing rate is proportional to the content of fine particles in the overburden.The ore drawing under the moraine overburden can be divided into four stages,including pure ore discharge,rapid inflow of a small amount of fine particles,mixing of fine particles with ore and large inflow of fine particles.Under the overburden moraine state of consolidation modification,the mixing rate of fine particles can be reduced by more than 50%,and the amount of ore drawing can be increased by 30%.Consolidation modification is an effective means to control the inflow mixing of fine particles of overburden moraine.
作者 王少勇 冯兴隆 吴爱祥 陈冲 黄恒 朱乾坤 眭素刚 孙熙宁 WANG Shaoyong;FENG Xinglong;WU Aixiang;CHEN Chong;HUANG Heng;ZHU Qiankun;SUI Sugang;SUN Xining(School of Civil and Resources Engineering,University of Science and Technology Beijing,Beijing 100083,China;Yunnan Diqing Nonferrous Metal Co.,Ltd.,Shangri-La,Yunnan 674400,China;Kunming Prospecting Design Institute of China Nonferrous Metals Industry Co.,Ltd.,Kunming,Yunnan 650051,China)
出处 《矿业研究与开发》 CAS 北大核心 2024年第4期40-45,共6页 Mining Research and Development
基金 国家自然科学基金项目(52130404) 中国博士后科学基金资助项目(2021M691359)。
关键词 自然崩落法 覆盖层冰碛物 细颗粒穿流 混入率 固结改性 Natural caving method Overburden moraine Inflow of fine particles Mixing rate Consolidation modification