期刊文献+

顾及基准点误差的自由设站平差及精度分析

Free Stationing Adjustment and Accuracy Analysis Considering the Datum Point Error
下载PDF
导出
摘要 观测误差和基准点误差是影响全站仪自由设站精度的2个重要因素。目前通常采用经典约束平差法进行自由设站数据处理,测站平差后,基准点误差会以原始数据误差的形式影响设站点坐标和碎部点坐标。在分析全站仪自由设站基本原理基础上,基于坐标转换思想建立同时考虑基准点误差和全站仪观测误差的自由设站平差模型,并给出具体的求解方法。实验结果表明:较大的基准点误差会对自由设站平差结果的精确度带来不利影响,基准点精度较高时,新平差模型结果与约束平差结果相当;基准点精度较低时,新平差模型结果较约束平差结果更优。 Observation errors and datum point errors are two important factors that affect the accuracy of total station free stationing.At present,the classical constrained adjustment method is usually used for data processing of free stationing.For this method,after the station adjustment,the datum point errors will affect the coordinates of stationing point and detail points in the form of initial data error.Based on the basic principle analysis of total station free stationing,we established the adjustment model of free stationing considering the datum point errors and the observation errors according to the thought of coordinate transformation,and gave the specific solution method.The experimental results show that the large datum point errors will have a negative effect on the accuracy of free stationing adjustment results.If the datum points have a high accuracy,the result of the new adjustment model is equivalent to that of the classical constrained adjustment.Otherwise,if the datum points have a low accuracy,the result of the new model is better than that of the classical constrained adjustment.
作者 刘琼琼 闫广峰 LIU Qiongqiong;YAN Guangfeng(Zhoukou Planning and Building Survey and Design Institute,Zhoukou 466000,China;School of Geography&Resources Science,Neijiang Normal University,Neijiang 641100,China)
出处 《地理空间信息》 2024年第4期88-91,共4页 Geospatial Information
基金 中国铁路兰州局集团有限公司科技研究开发计划资助项目(LZJKY2023033-1) 内江师范学院科研重点资助项目(2021ZD01)。
关键词 自由设站 基准点误差 坐标转换 测量平差 free stationing datum point error coordinate transformation survey adjustment
  • 相关文献

参考文献6

二级参考文献60

  • 1肖国峰,陈从新.喷锚网支护基坑监测及变形特性分析[J].岩土力学,2003,24(S2):275-278. 被引量:14
  • 2杨松林,刘维宁,师红云,黄方.全站仪自由设站隧道围岩变形非接触监测理论和方法的研究[J].土木工程学报,2006,39(4):100-104. 被引量:41
  • 3Joe N. Site layout with robotic total stations [J]. Concrete Construction- World of Concrete ,2003,48 (2) :28 - 32.
  • 4Villy K, Stefi K, Stathis S. Monitoring with electronic total stations: performance and precision of prismatic and non-prismatic reflectors [J]. Geotechnical News, 2007,25( 1 ) :30 - 33.
  • 5Psimoulis P A, Stiros S C. Measurement of deflections and of oscillation frequencies of engineering structures using robotic theodolites ( RTS ) [J]. Engineering Structures ,2007,29(12) : 3312 - 3324.
  • 6Merkle W J,Myers J J. Use of the total station for load testing of retrofitted bridges with limited access [C]// Smart Structures and Materials 2004. San Diego, USA, 2004:687 - 694.
  • 7Chen L C, Teo T A, Liu C L. Rigorous georeferencing for formosat-2 satellite images by least squares collocation [C]//IEEE International Geoscience and Re- mote Sensing Symposium. Seoul, South Korea, 2005: 3526 - 3529.
  • 8Perrey D E. Plane wave decomposition in the unit disc: convergence estimates and computational aspects [J].Journal of Computational and Applied Mathematics, 2006,193( 1 ) :140 - 156.
  • 9鲁铁定,陶本藻,周世健.基于整体最小二乘法的线性回归建模和解法[J].武汉大学学报(信息科学版),2008,33(5):504-507. 被引量:100
  • 10张广伟,李鹏,宫辉.城市地铁控制网稳定性分析及应用[J].测绘科学,2008,33(4):98-99. 被引量:27

共引文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部