桥梁工程超危大高支模施工方案编制要点分析

Analysis on the Key Points of Compiling the Construction Scheme of Super Dangerous and Large and High Support Forms for Bridge Engineering
下载PDF
导出
摘要 从模板施工要素确定、施工材料质量控制、变形缝和后浇带高支模处理措施以及设计参数选取等方面阐述了超危大高支模施工方案编制的要点,并以某桥梁工程高支模施工为研究对象,分析超危大高支模施工方案编制及高大支模工程关键施工技术的具体应用。 This paper expounds the key points of making super-dangerous and large-high form work-supporting construction plan from aspects of the determination of form work construction elements,quality control of construction materials,treatment measures of deformation joints and post-poured belt high form work-supporting and selection of design parameters.Taking the high form work-supporting construction of a bridge project as the research object,it analyzes the construction plan compilation of the super-dangerous and large-high form work-supporting and the concrete application ofthe key construction technology ofthe high form work-supporting project.
作者 韩玉成 HAN Yu-cheng(Xingtai Road and Bridge Construction Group Co.Ltd.,Xingtai 054000,China)
出处 《工程建设与设计》 2024年第7期233-235,共3页 Construction & Design for Engineering
关键词 桥梁工程 高大支模 支撑体系 施工方案 bridge engineering high formwork support support system construction scheme
  • 相关文献

参考文献1

二级参考文献5

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部